Assuming conventional finish -to-start relationships, to calculate a schedule retaining the existing logic means that
Which of the following risks CANNOT be estimated by BILCO with only a resource -loaded schedule?
Who will receive the most benefit from a master schedule of the Spring Highway project?
Using a 1.75 cubic yard [1.34 cubic meter] bucket, how many lifts does it take to pour each 2.000 - cubic foot [56.64 cubic meter] column?
The congested site only has room for 3 cranes to operate concurrently. Only 1.75 cubic yard ICY] or1.34 cubic meter [CM] concrete buckets are available. Each crane can perform up to 35 lifts per day. Assuming a total of 30 lifts per crane pet day. what is the maximum volume of concrete that could be placed using 3 small tower cranes over a 5-day period?
Which of the following types of delay will NOT result in a time extension and additional compensation for a contractor?