Which of the following is NOT a type of float?
The latest allowable end time minus the earliest allowable end time on a schedule activity is referred to as:
What is a basic element of work or a task that must be performed over a given period of time in order to complete a project called?
A concrete slab measuring 10 feet wide by 13.5 feet long by 6 inches deep is to be installed. How many cubic yards of concrete will be required?
A systematic coding structure for organizing and managing scope, assets, cost, resources, work and schedule activity information is a .
What do you call a person authorized to represent another (the principal) in some capacity? He/she can only act within this capacity or "scope of authority" to bind the principal.