Ready to Pass Your Certification Test

Ready to guarantee a pass on the certification that will elevate your career? Visit this page to explore our catalog and get the questions and answers you need to ace the test.

Exam contains 60 questions

Page 1 of 10
Question 1 🔥

The pipes of a VESDA smoke detection system are installed at the air intake of the air conditioner inside the computer room. Is this a good practice from an early smoke detection point of view?

Question 2 🔥

You need to determine the strategy for the cooling audit. All the servers are based on a front -to-rear (F-R) airflow design. Which location for the temperature/humidity measurement should you recommend for the audit?

Question 3 🔥

You are installing new copper cabling. What is the advantage or disadvantage of choosing pre-terminated category 6 or 6A cabling?

Question 4 🔥

When are the wet bulb and dry bulb temperatures identical?

Question 5 🔥

A new network storage device in a non-standard size rack of approximately 600 kg/1,300 lbs is going to be installed in the data center. Are new floor loading calculations required?

Question 6 🔥

Management has requested a 15-minute battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS: • Rated power: 30 kVA • Rectifier input voltage: 400 V/3 phase • Rectifier input power factor: 0.8 • Battery rated voltage: 384 V • Number of cells: 192 • End of discharge voltage: 308 V • Inverter output voltage: 400 V/3 phase • Inverter output power factor: 0.8 What information is missing to perform the battery calculation?

Lorem ipsum dolor sit amet consectetur. Eget sed turpis aenean sit aenean. Integer at nam ullamcorper a.

© 2024 Exam Prepare, Inc. All Rights Reserved.