The test infrastructure consists of facilities and resources required to conduct testing effectively. Which facility does not belong to the testing infrastructure?
See the specification below: IF A AND (B OR C) THEN error message ENDIF How many logical test cases are distinguished if Semantic Testing with coverage type decision points condition/decision coverage is used?
What can be avoided by consolidating separate checklists into one checklist for assessing a test basis?
Which test design technique uses operational profiles and load profiles?
What is the aim of the activity 'assessing the test basis'?
See the definition below: Tests in which the supplying party demonstrates that the product particularly meets the functional and non -functional specifications and the technical design, among other things. Of which test level is this the definition?