The method of Steepest Ascent guides you toward a target inside the original inference space.
Situations where standardized work needs to be incorporated include all of these except _____________________.
The Lean toolbox includes all of these items except ________________.
Questions that can be best answered by a Visual Factory include all of these except _____________________.
If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?
A ___________ is used primarily to track the stability of the average value of a metric of interest.