The Six Sigma methodology had its origins at __________________ in the late 1980’s when William Smith coined the name for quality related work being done there.
Training cost is $4,000 and a project required an initial investment of $30,000. If the project yields monthly savings of $2,000 beginning after 3 months, what is the payback period in months (before money costs and taxes)?
Lean Six Sigma’s general approach to solving significant challenges related to a process is called _________________.
Voice of the Customer is a Lean Six Sigma technique to determine ____________________ attributes of a product or service.
Those who are trained to the skill levels of a Black Belt are typically utilized to apply Lean Six Sigma methodologies what percentage of their time?
Which of these are correct if Cpk Upper is 2.0 and Cpk Lower is 1.0?