If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?
When analyzing a data set we frequently graph one metric as a function of another. If the slope of the Correlation line is -2.5 we would say the two metrics are ___________ correlated?
Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).
The use of station warning lights, tool boards and jidohka devices in the application of Lean accomplish which of these principles?