Which three tasks must be performed by the ACP 4200 implementation team at the customer site? (Choose three.)
An installation engineer is installing the power connections to the ACP 4200.What must the installation engineer be aware of?
Aside from the difference in the depth of the enclosure, what other difference is there between the 48 Inch Model and 42 Inch Model of the ACP 4200 Avaya-branded Enclosure?
Which three tasks must be completed in preparation of a site for an ACP 4200 installation? (Choose three.)
When preparing a site for an ACP 4200 installation, which task is optional?
When used for an ACP 4200, which two features of the 48 inch Avaya branded enclosures are different from the 42 inch models? (Choose two.)