A cloud architect is creating a solution to allow virtual machines to be provisioned into a DMZ. Security requirements specify that all traffic between DMZ and internal networks must pass through the firewall. As long as this requirement is met, DMZ zone and internal zone resources must be pooled to reduce costs.Which action is the most likely to meet these requirements?
A company wants to adhere to Cisco UCS best practices for booting Cisco UCS B-Series Blade Servers and also maintain the highest level of availability. Which boot policy must the company use?
A cloud engineer is implementing a new cloud infrastructure with the following equipment:✑ One Cisco UCS 5108 AC2 B-Series Chassis✑ Two Cisco Nexus 5000 Series Switches✑ Two Cisco UCS 6248 Fabric Interconnects✑ One Cisco UCS 2208XP Fabric Extender✑ Eight Cisco B200 M4 half-width bladesWhich option describes the most likely problem with this deployment?
An engineer is installing ESXi on a new Cisco UCS Blade Server and wants all the required drivers for the server to automatically load during the installation ofESXi. Which image must the engineer use to accomplish this?
A data center admin is trying to use a template to deploy a new Cisco UCS service profile, but finds that the WWPN pool has been exhausted. How can this issue be resolved without changing the service profile template?
An engineer is troubleshooting a new hypervisor install in which the management VMK is inaccessible from the user subnet. Which CLI command issued within the upstream Cisco Nexus 5672 switch verifies its gateway interface can resolve the address mapping of the VMK?