DRAG DROP -Refer to exhibit. PE1 and PE2 has a Layer 2 VPN over a GRE tunnel. The GRE tunnel built between P1 and P2 has LDP enabled. Consider a packet capture of the packets from CE1 and CE2 at P1 and R1 link. Drag and drop the headers on the left onto the correct order of the encapsulation on the right, starting from the inner header (at the top) to the outer header (at the bottom).Select and Place:
Which are the two limitations of the predefined NAT solution? (Choose two.)
Refer to the exhibit. All PE routers are configured with full-mesh MP-BGP and VPNv4 routing to provide L3VPN services. A central services VRF is implemented, to provide management and monitoring products to customers with dedicated VRFs. The objective of this design is to provide routing between the central servicesVRF and VRFs A and B. Which Implementation achieves this goal?
In the Dual Stack Lite solution, what is the function of the B4 component?
Refer to the exhibit. The Service Provider is deploying Internet service to its VRF customers by using vrf INTERNET. A dedicated firewall provides NAT functionally towards the Internet. Assume that IP address overlapping between VRFs is not an issue.Which three configuration steps are required to add Internet service to the VRF customers? (Choose three.)
Which are the two purposes of the MPLS label value 1? (Choose two.)