Ready to Pass Your Certification Test

Ready to guarantee a pass on the certification that will elevate your career? Visit this page to explore our catalog and get the questions and answers you need to ace the test.

Exam contains 55 questions

Page 5 of 10
Question 25 🔥

A company has a cluster with two subnets. The first subnet has 1 GbE interfaces dedicated for management and the second subnet has 10GbE interfaces dedicated for handling all data access. When the cluster started serving the production environment, poor performance was observed while the data is accesses through the data subnet. While troubleshooting the network, the administrator discovered that the return traffic is going through the management network. Which recommended solution will resolve this issue?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 26 🔥

A company has a Dell EMC Isilon cluster that will be used for a large amount of client requests. SmartConnect has been configured to help load balance the clients across the cluster. How does SmartConnect help the load balancing?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 27 🔥

A Dell EMC Isilon administrator has a 6-node X400 cluster. As the hardware is approaching end of service life, the administrator has planned for a technical refresh by replacing the 6-node X400 cluster with a 4-node H500 cluster.The new 4-node H500 is added to the existing cluster and a SmartPools trial license is activated for data migration. The default location for the data and snapshots is changed in the default file pool policy from an X400 node pool to a H500 node pool. The SmartPool job is then run manually.After the SmartPool job is finished, the X400 node pool still consumes approximately 10% of the storage.What is a possible reason for this issue?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 28 🔥

A company has an 8-node Dell EMC Isilon cluster configured with SmartConnect. The device IDs of the nodes are 1 through 8. However, the node with the SSIP failed.Which cluster node will have the SSIP assigned after the failure?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 29 🔥

A company wants to purchase four new Dell EMC Isilon H500 nodes to add their current Gen 5 cluster. Which internal requirements are needed?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 30 🔥

Which protocol is used to send isi diagnostic gather logs from a Dell EMC Isilon cluster to Dell EMC Support when the ESRS gateway is unavailable?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question

Lorem ipsum dolor sit amet consectetur. Eget sed turpis aenean sit aenean. Integer at nam ullamcorper a.

© 2024 Exam Prepare, Inc. All Rights Reserved.