A customer plans to connect 40 Voice over IP (VoIP) phones and 8 security cameras to a switch:✑ The VoIP phones are Class 2 PoE devices and require a maximum of 45W (draw a maximum of 5w)✑ The security cameras are Class 4 PoE+ devices and require a maximum of 17W (draw a maximum of 20 W)✑ The network architect is proposing an HP 5500-48G-PoE switch, which supports PoE and PoE+ and has a PoE power budget of 370W✑ The customer and architect agree on the class form of power allocationWhat else does the solution require?
HOTSPOT -Match the customer need with the HP FlexFabric technology that meets the need.Hot Area:
A network architect is planning the top of the Rack (ToR) switches for a data center solution. The customer has a hot aisle/cool aisle configuration.Which characteristic of the switch relates to this plan?
Which two requirements of a modern data center make Spanning Tree Protocol (STP) and other traditional loop elimination protocols for that environment?
Refer to the exhibit.The exhibit is a plan for Open Shortest Path First (OSPF) areas. What should the network architect do to improve the OSPF network design?
Refer to the exhibit.The exhibit shows a proposed design for a data center network infrastructure. The exhibit shows two racks for simplicity. The data center will actually include more racks.The customer has these key requirements:✑ The customer can scale any application and easily install new hardware that supports that application✑ The network supports vMotion for live migration of virtual machine (VMs)How should the network architect change the proposed design to meet the customer requirements?