Refer to the exhibit -SPBM is being implemented on the backbone links shown in the exhibit. The servers in VLAN 10 (10.1.10.0/24) should be able to communicate at Layer 2 across the backbone. In the vsi section of the configuration on Switch 1. which logical components are required?
Which statement is correct about a Fibre Channel (FC) World Wide Name (WWN)?
Refer to the exhibit -An HP Comware switch is configured to support FCoE in Fibre Channel Forwarder (FCF) mode. Serverl should be able to discover storage targetl and target2. but not target3. Assume that the zone-aliases have been configured to reference the FC devices correctlyWhich zone(s) should be added to the active zoneset?
Refer to the exhibit -A VSAN is being set up on an HP Comware switch that will connect to server Converged Network Adapters (CNAs) and storage systems The administrator is checking the configuration of the VSAN with display commands The exhibit shows the results.What is a potential issue?
HP Comware Switch 1 connects to servers with Converged Network Adapters (CNAs) that send data and FCoE storage traffic Switch 1 should forward all FCoE traffic to an upstream FCoE switch. Switch 2 which will handle all the FLOGI requests, zoning, and FC traffic forwarding.What is the correct FCoE mode setting for Switch 1?
An administrator configures two VSANs on an HP Comware IRF virtual switch. The IRF members connect to a server with two Converged Network Adapters(CNAs) One CNA is connected to VSAN 1. and the other is connected to VSAN 2 The storage target for the server is also connected to VSAN 1 and VSAN 2.What is required for this setup to work?