Refer to the exhibit.Based on the Synergy configuration shown, what will be the outcome in the event of an end-of-row (EoR) switch failure?
Refer to the exhibits.A customer has a Synergy 2-frame design, as shown above.Due to expanding business needs, the customer has ordered a third frame to expand the environment to a 3-frame fabric design, as shown below.While attempting to extend the Logical Interconnect Group (LIG) for the enclosure group, the Synergy integrator is unable to add the third frame.What is preventing the integrator from adding the third frame?
DRAG DROP -Use the arrow or click and drag the steps on the left to set up a new HPE Synergy 12000 Frame into the correct order on the right.Select and Place:
Refer to the exhibit.A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules.What is the maximum number of compute nodes that the customer's fabric could support?
Refer to the exhibit.How should a Synergy integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?
Refer to the exhibit.A customer with the configuration shown attempts to configure a server profile for a new application that requires 20Gb of bandwidth, but the configuration fails.The HPE SY 480 Gen9 compute modules have two Intel Xeon E5 "" 2695 v4 processors. 256GB of RAM and HPE Synergy 3520C Converged Network Adapters installed.What is the likely cause of the configuration failure?