During the installation of an air conditioner system, which of the following statements are correct about the draining impurities from the refrigerant pipe?
In the FusionModule800 grounding solution, each cabinet is connected to the ground bar of the data center.
During filling refrigerant for NetCol5000-A, there is no need to put the refrigerant steel cylinder upside down on balance.
Smart ETH gateways cannot be cascaded.
The ECC800-Pro is the core component for FusionModule2000 local management. Southbound components can be using the PoE bus.
In the water-side free cooling solution, cold water cannot be transported directly from the cooling tower to chilled conditioner?