A customer currently is running a POWER7 6-core 720 with 3 IBM i cores for production, and utilizing Power HA to a POWER6 2-core server as their backup machine.The production machine also has unlimited users, IBM i Access users, SOL, and ILE Compilers. They are only using the backup machine to do backups, but it is not a CBU; it has only one IBM i and one licensed Power HA core.The customer wants the backup server to have the same capacity as the production server so it can be a true high availability server.Which of the following is the correct course of action at the least cost?
What is the number of threads that can be processed for maximum throughput on a POWER8 core?
Which of the following statements correctly describes a difference between the S814 and S824?
A customer is ordering a 4-core S814 with the following partitions. The default processor pool will be used.An IBM i partition capped at 1.0 processors.A second IBM i partition capped at 0.5 processors.An AIX partition capped at 0.5 processors.A Linux partition capped at 0 5 processors.How many IBM i processor licenses are required to support this configuration?
A customer needs faster response time from their database server and is considering purchasing POWERS. They are familiar with Easy Tier, and have heard that they can use it locally on some servers.Which feature(s) would enable this function?
What is a characteristic of virtualizing workloads?