What is the next step for a failed installation of an IBM TS4500 where there have been I/O errors that prevent placing the library into production even after replacement of multiple parts and verification of configuration definitions?
A customer has a requirement for 250,000 IOPS and 200 TB of capacity. The customer requires IBM SSR maintained code upgrades as a standard term and condition.Which solution should the technical specialist recommend to the customer?
Which solution provides a customer with encryption-enabled, large-capacity drives that support VMware Virtual Volumes (VVOL)?
Which IBM tool can be utilized to determine if Real-time Compression can help in an IBM SAN Volume Controller or IBM Storwize V7000 environment to reduce storage acquisition costs?
A customer has a single frame IBM TS3500 Tape Library with six 3592-E07 drives. A new open systems server has recently purchased and, because of budget constraints, the customer is considering less expensive LTO-6 drives while protecting investment in existing tape cartridges.What is the most economical way to achieve this goal?
A customer is thinking about purchasing IBM storage for the very first time and asks for IBM’s help to evaluate life cycle cost comparisons between vendors.How can this customer’s question be answered?