It has been decided by management to ask an external consultant to perform a reliability assessment. The external consultant will use a checklist to support the assessment. Select TWO checklist items that are most likely to be part of a reliability checklist.
As a technical test analyst, you have found out during test case design that the design document is incomplete. Which is an example of a good way to communicate that problem in an email?
The comment frequency of the code fragment is 13%. To which ISO 9126 quality attribute does a good level of comment frequency especially contribute?
Which additional set of test cases is needed to achieve both 100% statement coverage and 100% decision coverage?A.B.C.D.
How many test cases are required to test a specification that has three conditions using a decision table testing which is not collapsed?
What are the TWO most significant benefits a test execution tool should bring to the organisation?