Ready to Pass Your Certification Test

Ready to guarantee a pass on the certification that will elevate your career? Visit this page to explore our catalog and get the questions and answers you need to ace the test.

microsoft 70_342

Custom view settings

Exam contains 166 questions

Page 3 of 28
Question 13 🔥

DRAG DROP -Your company has two offices. Each office is configured as an Active Directory site. The sites are named Site1 and Site2.You have an Exchange Server 2013 organization that is configured as shown in the following exhibit. (Click the Exhibit button.)Datacenter Activation Coordination (DAC) mode is enabled on the database availability group (DAG) named DAG1.You are testing a site failover by shutting down all of the servers in Site1.You need to mount the databases in Site2.Which three commands should you run in sequence? (To answer, move the appropriate three commands from the list of commands to the answer area and arrange them in the correct order.)Select and Place:

Question 14 🔥

DRAG DROP -You have an Exchange Server 2013 organization.Your company identifies the following security requirements:✑ Users must be able to send encrypted email messages that can only be decrypted by the intended recipient.✑ All email messages sent by a user named User1 to an external recipient must be protected by using TLS.✑ All SMTP sessions to a remote SMTP host named SMTP1 must be encrypted.You need to recommend which technology must be used to meet each requirement.Which technologies should you recommend? (To answer, drag the appropriate technologies to the requirements in the answer area. Each technology may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.)Select and Place:

Question 15 🔥

HOTSPOT -Your company has a main office and a disaster recovery site. An Active Directory site named MainSite exists for the main office. An Active Directory site namedDRSite exists for the disaster recovery site. The two sites connect to each other by using a WAN link. All users work in the main office.You have an Exchange Server 2013 organization. The organization contains six servers. The servers are configured as shown in the following table.All of the Mailbox servers are members of a database availability group (DAG) named DAG1.After a WAN link failure, you discover that all of the active mailbox database copies are located on MBX3, even though MBX1 and MBX2 are still running.You need to prevent an automatic failover of DAG1 if the WAN link between the two sites fails but the servers in both sites are still running.The solution must prevent two active copies of the same database.What should you do? (To answer, select the appropriate options in the answer area.)Hot Area:

Question 16 🔥

You have an Exchange Server 2010 organization that contains three servers. The servers are configured as shown in the following table.Microsoft Outlook is configured to connect to an FQDN of mail.adatum.com. Mail.adatum.com resolves to the IP address of a Layer 7 hardware load balancer. The hardware load balancer is configured to send traffic to EX2 and EX3.You deploy an Exchange Server 2013 Mailbox server named EX4 and an Exchange Server 2013 Client Access server named EX5.You plan to migrate all mailboxes to Exchange Server 2013.You need to recommend a solution to ensure that users can access their mailbox on EX1 or EX4 during the migration.What should you do?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 17 🔥

Your company has three data centers. The data centers are located in Montreal, New York, and Seattle.You have an Exchange Server 2013 organization that contains six servers. The servers are configured as shown in the following table.The organization is configured as shown in the following exhibit. (Click the Exhibit button.)The file share witness for DAG1 is located on EX3.You plan to implement site resiliency and use a single name space named mail.contoso.com.You need to recommend a solution to minimize the amount of time that the Exchange Server services are unavailable if either the data center in Montreal or the data center in Seattle fails.Which two tasks should you recommend performing? (Each correct answer presents part of solution. Choose two.)

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 18 🔥

You have an Exchange Server 2013 organization that contains two servers. The servers are configured as shown in the following table.EX1 and EX2 are members of a database availability group (DAG) named DAG1. You have a database named DB1 that replicates to EX1 and EX2.EX1 fails.You discover that DB1 does not mount on EX2.You view the status of the mailbox databases as shown in the following table.You need to ensure that the database attempts to mount on EX2 if EX1 fails.What should you change?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question

Lorem ipsum dolor sit amet consectetur. Eget sed turpis aenean sit aenean. Integer at nam ullamcorper a.

© 2024 Exam Prepare, Inc. All Rights Reserved.