An organization has two teams of developers. One team develops web applications. The other team develops mobile applications.You administer servers for the organization. All four servers run Windows Server 2012 R2 and are part of a Hyper-V cluster. You create six virtual machines (VMs) for each team.You plan to create a virtual environment for the teams. You have the following requirements:✑ Both teams must use the 10.10.10.0/24 subnet.✑ Each VM for the web application team must have network connectivity with all other web application VMs.✑ Each VM for the mobile application team must have network connectivity with all other mobile application VMs.✑ The VMs for the web application team must NOT connect to the VMs for the mobile application team.You need to create the network for the VMs.What should you do?
HOTSPOT -A company has a single Active Directory Domain Services (AD DS) domain and four Windows Server 2012 R2 servers that have the Hyper-V role installed. The company uses System Center 2012 R2 Virtual Machine Manager (VMM) to manage the Hyper-V environment. One set of Hyper-v host servers is dedicated for use by the development environment. A second set of Hyper-v host servers is dedicated for use by the production environment.The network architects assign the IP address subnets as shown in the following table:The network architects also prepare a network design for the Hyper-V environments as shown in the Network Design exhibit. (Click the Exhibit button.)The implementation team reports a problem with IP addressing as shown in the Network Error exhibit. (Click the Exhibit button.)You need to ensure that the implementation team can implement the network design successfully.For each of the following statements, select Yes if the statement is true. Otherwise, select No. Each correct selection is worth one point.Hot Area:
You are the virtualization administrator for an organization. The organization uses all components of System Center 2012 R2 in the production environment. A power supply in a Hyper-v host server fails. The host server continues to run and host virtual machines in this degraded state.You have the following requirements:✑ Move virtual machines from host servers that are running in a degraded state to another host server.✑ Prevent placement of new virtual machines on degraded host servers.You need to configure the environment.Which System Center feature should you implement?
A company has offices in Hamburg, New York, and San Francisco. The Hamburg office has one Hyper-V host server named HAM-HOST1. The New York office has two Hyper-V host servers named NYC-HOST1 and NYC-HOST2. The San Francisco office has one Hyper-V host server named SFC-HOST1. All Hyper-V host servers run Windows Server 2012 R2.You must deploy an application virtual machine (VM) that will be used by the sales team at the company.You need to ensure that the VM remains available during unplanned system outages.Which solution should you implement?
DRAG DROP -A company uses System Center 2012 R2 Virtual Machine Manager (VMM). The VMM server has the following shares:You need to configure VMM to share physical resources with private cloud users.Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.Select and Place:
Contoso, Ltd. has a Windows Server 2012 R2 server with the Hyper-V role installed. Contoso has a virtual machine named CVM1. The company uses SystemCenter 2012 R2 Virtual Machine Manager (VMM) to manage the environment.Contoso acquires Fabrikam, Inc. Fabrikam has a Windows Server 2012 R2 server with the Hyper-V role installed.CVM1 must be able to communicate with a virtual machine named FVM2 on a non-routable subnet in the Fabrikam Hyper-V environmentYou need to ensure that CVM1 can communicate with FVM2.Which technology should you implement?