DRAG DROP -A company implements Dynamic 365 for Finance and Operations. You run the latest master plan. You observe invalid results.You need to set up tracing for the master plan.In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.Select and Place:
You are the lead product design engineer at a plastics manufacturing company. You implement a new process that uses a single tool to produce three finished goods at the same time.You need to set up the planning item number and formula to correctly to manufacture the three items.Which three actions should you perform? Each correct answer presents part of the solution.NOTE: Each correct selection is worth one point.
A company produces homeopathic lotions for pain relief and uses Dynamics 365 Supply Chain Management. You have replaced the vendor of a product's active ingredient with a new vendor. The new vendor is supplying the ingredient at a higher concentration of 25 percent.The previous vendor concentration was 15 percent. You are consistently running out of two of the complimentary ingredients.You need to update the formula and ingredient settings to allow for better order planning.What should you do?
You are the production scheduler at a manufacturing company. The company is not using advanced warehousing.You have firmed a planned production order from master planning. The order is ready to be processed.You now need to process the order in production control.What should you do first?
A company produces various products using Process manufacturing.The manufacturer makes two co-products from a formula and rarely produces the primary formula item. The costs of making the co-products are inflated. The manufacturer must update the costs of producing the co-products and change the formula to not produce the primary formula item.You need to change the primary formula item type.What should you do?
A chemical manufacturing company uses Dynamics 365 Supply Chain Management. A batch of material has a quality issue and must be reworked.You need to create the rework order the production.Which three options must be set? Each correct answer presents part of the solution.NOTE: Each correct selection is worth one point.