HOTSPOT -You need to calculate estimated consumption of ingredients for liquid cleaning solution.What is the consumption? To answer, select the appropriate option in the answer area.NOTE: Each correct selection is worth one point.Hot Area:
HOTSPOT -A customer produces light projection toys for holiday decorations throughout the year. Because holidays vary by region and time of year, the company wants to implement Lean manufacturing.The production process creates the toys at the following work cell: stands, main assembly, electric, visuals, and packaging.You need to implement the production process.Which configuration options should you use? To answer, select the appropriate configuration options in the answer area.NOTE: Each correct selection is worth one point.Hot Area:
A company uses cost groups to track calculated costs of items preassembled by vendors.The company needs to analyze service costs for each vendor’s preassembled items.You need to assign the cost group type to the preassembled items.Which costs should you assign?
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solution, while others might not have a correct solution.After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.A company implements Dynamics 365 Supply Chain Management for their Lean manufacturing environment.There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step.The existing version must be phased out and replaced by the new version.You need to ensure that the engineering change takes affect at the end of the month.Solution:✑ Edit the existing production flow and set the expiration date to the end of the month.✑ Using the existing production flow, create a production flow and version. Set the expiration date to the end of the month. Create an activity for the new process step and add it in the proper sequence.✑ Create a Kanban rule that uses the last day of the month as the effective date.✑ Edit the existing Kanban rule. Set the expiration date to the end of the month. Set the new Kanban rule as the replacement Kanban rule.✑ Activate the new production flow.Does the solution meet the goal?
DRAG DROP -A pharmaceutical manufacturer uses Process manufacturing.You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.You need to change the coverage group of the items.Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.Select and Place:
DRAG DROP -A company uses Process manufacturing.You need to review formulas and how the different ingredient types impact the batch balancing process.Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.NOTE: Each correct selection is worth one point.Select and Place: