Systems and structures are the basis for allowing people to change their behaviors permanently and are accomplished through which of the following?
The Control Plan is created following the finalization of the Measure Phase and can be closed when?
To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of ________________ into the process.
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.
When a process has proven itself to function at a Six Sigma level this means there are less than 3.4 defects per ___________ opportunities.
Training cost $2,500 and a project required an initial investment of $23,500. If the project yields monthly savings of $2,500 beginning after 4 months, what is the payback period in months (before money costs and taxes)?