The Lean Principle action in the 5S approach that deals with having those items needed regularly at hand and those items need less regularly stored out of the way is known as ___________.
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?
When analyzing a data set we frequently graph one metric as a function of another. If the slope of the Correlation line is -2.5 we would say the two metrics are___________ correlated?
Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).
The actual experimental response data varied somewhat from what a Belt had predicted them to be. This is the result of which of these?