The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of supporting the Response Plan.
To minimize waste through the application of Lean Principles we do which of the following?
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as ____________ .
An important factor in a viable Control Plan is to determine who, when and to what level various personnel must be _________ to maintain the improvements made to a process.
Upon completion of a project a Belt must complete the ____________________ then transfer responsibility for this to the Process Owner.
Six Sigma refers to a process whose output has 100% of its data points within 8 Standard Deviations from the Mean.