What is a strategy to reduce the number of vehicles required for building occupants?
Prior to final selection of the project site, the owner and design team should confirm that the site is ____?
What is the legal instrument that regulates current land use?
An elementary school remodel project has 816,364 square feet of existing walls, floors, and roof. What is the minimum amount of this area that must be reused to earn 2 points for Materials and Resources credit, Materials Reuse- Maintain Existing Walls, Floors, and Roof?
What is the primary environmental concern with refrigerants used in HVAC&R systems?
Which of the following would satisfy the requirements to earn a point for Innovation in Design? (Choose 2)