An administrator has applied a Service 2 patch after taking a snapshot. The administrator then realizes that a Service 1.5 patch should have been applied before the Service 2 patch.Refer to the exhibit:Which series of actions should be taken to manage this issue?
Which DRS score indicates that the virtual machine (VM) is experiencing severe resource contention?
Refer to the exhibit:An administrator deletes the Service 1.5 snapshot.What is the result of this action?
An administrator would like to add a new server into an existing vSphere cluster. The servers are running Intel processors. The administrator needs to ensure that the new server can be added to the cluster with the same processor baseline as the existing servers.Which strategy should be used to achieve this goal?
Which two physical resources are abstracted by the hypervisor and presented to virtual machines? (Choose two.)
An administrator needs to separate traffic of virtual machine live migrations from all other traffic.Which TCP/IP stack meets this requirement?