An architect is responsible for the availability design of a solution.The following information has been provided:Virtual machines (VMs) run 8 or less vCPUsAll hosts have a minimum of two NICs per vSphere distributed switch (VDS) connected to separate physical switchesAll hosts have a minimum of two host bus adapters (HBAs) connected to separate physical switchesWhich three options maximize VM availability in the event of an ESXi host failure? (Choose three.)
An architect is responsible for designing the upgrade of a brownfield vSphere-based solution for a financial services customer. The customer has a requirement to host a mission critical, latency sensitive stock trading application.During initial meetings with the customer, the following information is provided:The solution is currently running vSphere 7.0 U3All vSphere distributed switches (VDS) are at version 7.0.0The customer has provisioned new hardware with dedicated AMD Data Processing Units (DPU)The mission critical applications must not be adversely affected by other workloads running in the environmentThe architect has made the following design decisions:The solution will upgrade the existing VMware vCenter Server to version 8.0The solution will upgrade all existing VMware ESXi hosts to version 8.0The solution will deploy VMware ESXi 8.0 for all new host serversWhich three additional design decisions should the architect make to ensure that the new hardware can be used to support the latency-sensitive application? (Choose three.)
An architect is discussing recoverability considerations for a new vSphere solution as part of a requirements workshop. The customer has informed the architect that the company policy is to not perform backups of ESXi hosts due to their selected backup software not supporting the ESXi software. In the past, when hosts have experienced failures, the hosts have been reinstalled from the VMware provided ESXi image and manually configured by an administrator. The customer asks the architect to design a solution that will reduce the manual effort required by the administrator to return a failed host to service.What could the architect include in the design to meet the customer's request?
A company has a requirement that all production applications must have a maximum tolerable downtime (MTD) of one hour per month.Which statement would be included in the conceptual design to support this requirement?
A company will be replacing the external storage array that is currently providing storage to the vSphere environment. The architect must design a storage architecture for existing and future workloads. Company policy required storage separation of workloads by departments.Which design decision should the architect make to satisfy the requirement and scale for additional departments?
An architect is reviewing the information provided by a customer for a new vSphere solution design. The customer requests that the solution use multiple network connections for the ESXi management network to increase resilience.