An architect has designed a vRealize Log Insight (vRLI) cluster for an organization. Details of the cluster are provided below:✑ 3-node vRealize Log Insight cluster to collect logs for an organization✑ NFS storage is enabled for archival dataOnce the NFS storage is full, which will be the resulting scenario?
An architect is completing the physical design for a vRealize Operation (vROps) solution for a customer. The customer has only provided the following information for their existing environment:✑ 500 Virtual Machines2 VMware vCenter Servers✑ 10 VMware vSphere Horsts✑ 20 Datastores✑ Live data should be stored within the vROps solution for 6 months✑ The RTO for all existing management components is 4 hours✑ The RTO for all existing management components is 1 hourWhich two assumptions could the architect make when sizing the vROps cluster? (Choose two.)
An architect is responsible for reviewing the requirements for an existing Cloud Management solution design.Which requirement would be considered as a functional requirement?
An architect is responsible for creating the design for vRealize Operations. The following requirements, constraints, and recommendations were gathered:✑ Enable Continuous Availability✑ Monitor two physical locations✑ The sizing guide recommends deploying 5 analytics nodesWhat are two design considerations for the analytics node deployment? (Choose two.)
An architect has been engaged to update an operations management solution design to include VMware vRealize Suite Lifecycle Manager (vRSLCM) so that the support team can reduce the complexity of environment and content management activities. The customer has provided the following information with regards to the existing environment:There are four environments for business applications:✑ Development✑ Staging✑ Production✑ DR-The solution consists of two well-connected data centers (with low latency, high bandwidth links).-All Production workloads and management tooling are deployed to Data Center 1 (DC1).-All Staging, Development and DR workloads run in Data Center 2 (DC2).-Each physical data center has one vCenter Server and a sufficient number of hosts for workload and management.-There are two separate VMware vRealize Operations (vROps) clusters, one in each data center location.-Currently all content is developed in the DC2 vROps cluster before being manually imported into the DC1 vROps cluster.Which two design decisions should the architect include in the solution? (Choose two.)
An architect is responsible for creating a new design to centralize the logging infrastructure for an existing vSphere environment. The key stakeholder in the project has provided the following list of requirements:✑ The management solution must forward all logs to the existing centralized Security Incident and Event Management (SIEM) solution.✑ The management solution must be a minimum of N + 1 resilient.✑ The management solution must provide the ability to view at least 2 months of live data.✑ The management solution must meet a monthly uptime SLA of 99.9%.✑ The management solution must support the collection of logs from ten geographically separated data center locations.✑ The management solution must support the collection of a minimum of 10,000 events per second.Given the information from the stakeholder, which two statements would be considered functional requirements? (Choose two.)