The vSAN host memory needs to be replaced and the entire operation is expected to take 90-120 minutes.Which vSAN advanced setting can be adjusted to avoid rebuild operations during the host hardware maintenance?
You are designing a vSAN stretched cluster solution.What is the maximum number of nodes possible for this solution?
What are two recommended reasons for configuring a cluster with at least one node in addition to the minimum required number? (Choose two.)
vCenter reports a number of vSAN network alarms on a 2-node vSAN Direct Connect cluster. The test pings show irregularities in the ping results.Using vSAN Health service, which two checks should be used to identify the network root cause? (Choose two.)
A vSAN administrator is designing a new all-flash vSAN cluster. The cluster will host read intensive applications.Which factor should be included in the design to improve read performance?
Which two vSAN Health Check items are included for vSphere Update Manager integration? (Choose two.)