Which description is a valid use case for an administrator to configure an HCI Mesh?
An administrator wants to put the witness host in a 2-node vSAN configuration in maintenance mode.What should be verified before putting the witness host in maintenance mode?
An administrator would like to upgrade a stretched vSAN cluster to vSAN 7.0 U1. The following information is known about the vSAN cluster:• vSAN Version: 6.7 U3• Total number of vSAN data nodes: 12• Encryption: Enabled• vSAN Total Used Capacity: 30%• Single Hardware VendorWhere possible, the administrator wants to ensure the latest management capabilities are used in order to ensure that any future vSAN upgrades are supported with minimal additional effort.In preparation, the administrator has completed the following task:• Upgraded vCenter Server to vCenter Server 7.0 U1.Which two additional steps must the administrator complete? (Choose two.)
Which certificate file is needed to establish a Standard Key Provider trusted connection between vCenter and its Key Management Server (KMS)?
An administrator is reviewing the root cause analysis of a failure event that resulted in vSAN Data Loss. The following information is known about the event:1. The RAID battery-replacing procedure on one of the first vSAN cluster node took much more time than the vSAN administrator predicted.2. The only Storage policy has a Primary level of Failures To Tolerate = 1.3. Whilst the first host was in maintenance mode, another node failure occurred, causing da-ta loss in the vSAN cluster.The administrator needs to update the procedure for completing maintenance on the cluster.Which Maintenance Mode option should the administrator choose to ensure that data loss does not occur in the future?
An existing vSAN customer is considering vSAN File Services, and based on the current state analysis, the following information was provided:• 7 vSAN ROBO clusters• The clusters have two hardware BoM (Bill of Materials):o BoM-01 Test & Dev Environment:• 4 CPUs @ 2.50 GHz with 2 cores per CPU.• 128 GB Memory.• CachingTier 960 GB.• CapacityTier 1.8 TB x 4.• 10 GigE.o BoM-02 Production Environment:• 4 CPUs @ 2.60 GHz with 6 cores per CPU.• 256 GB Memory.• CachingTier 960 GB.• CapacityTier 6 TB x 4.• 10 GigE.Which two recommendation should the architect propose? (Choose two.)