VCF design workshops have been conducted, and the architect collected the following customer requirements for the newly planned VCF infrastructure:• The new VCF infrastructure is targeting two zones: DEV/UAT and DMZ.• The infrastructure team requested that the number of management components be minimized as much as possible.• Eight hosts should be ordered for the DEV/UAT environment.• Four hosts should be ordered for the DMZ environment.• The DEV/UAT workloads must comply with an erasure coding vSAN storage policy and have the ability to tolerate the failure of two hosts.Which workload domain sizing will be required to achieve these requirements?
Which three requirements are needed to provision an additional cluster within VMware Cloud Foundation? (Choose three.)
An administrator is creating a VMFS on FC-based VI Workload Domain.Which two licenses must already be present in the SDDC Manager inventory? (Choose two.)
Which order of operations deletes a VI Workload Domain from a VMware Cloud Foundation environment?
An administrator is planning to enable vSphere with Tanzu on an existing VI workload domain. The following information is known:• There is one vSphere cluster in that domain where all ESXi hosts have two uplinks.• The NSX edge cluster will be deployed on the same vSphere cluster.• Both System and NSX traffic will use the same uplinks of the VDS switch spanning the ESXi hosts.Which statement accurately describes the deployment of this NSX edge cluster?
An administrator is creating a VI Workload Domain where NSX-T must be configured to allow for dynamic routing.Which pre-requisites are required?