Which two requirements are needed to add new hosts to an existing VI workload in a VMware Cloud Foundation environment? (Choose two.)
VCF design workshops were conducted, and the architect collected the following customer requirements for the newly planned VCF infrastructure:The new VCF infrastructure must target two zones: DEV/UAT and DMZ.The security team would like to have full management and network isolation between these two zones.12 hosts have been ordered for the solution.DEV/UAT workloads must comply with an erasure coding vSAN storage policy with the ability to tolerate the failure of two hosts.Which workload domain sizing will be required to achieve these requirements?
An administrator successfully finished restoring a SDDC Manager and now needs to verify its operation.Which tool should the administrator use for this verification?
A VMware Cloud Foundation administrator is required to enable Workload Management (vSphere with Tanzu) on an existing workload domain cluster, which is currently licensed with a vSphere Enterprise Plus license.Which action, if any, is required to complete this task?
During a VCF design workshop, the architect gathered the following customer requirements:There must be two environments: PROD and DEV.PROD and DEV should be administratively separated.PROD will use two different hardware server types, and DEV will only use one hardware server type.The VCF infrastructure design should be flexible and scalable as much as possible.How many NSX local managers in total will be provisioned after deploying the full VCF infrastructure?
Which three components are required to deploy a stretched cluster in a VMware Cloud Foundation environment? (Choose three.)