SIMULATION -A customer must configure a peer link between two switches in the L2 MC-LAG scenario.SwitchB has already been configured. Configure the peer link on SwitchA. Use the following configuration information:MC-LAG domain 1 -VLAN 101 -Peer link Port-Channel 100 -SwitchA IP: 192.168.1.1/24 -SwitchB IP: 192.168.1.2/24 -MC-LAG system MAC: 00:00:00:11:11:11The physical ports to connect the peer switch are Eth 1/5 and Eth 1/6 for each switch.When you have finished, continue to the next question.
SIMULATION -Configure a VRF called “VrfGreen” and the static route in it to network 172.16.128.64/28 through next-hop 10.10.10.1. Set an administrative distance of 213.When you have finished, continue to the next question.
Which three actions are required to route traffic sourced from voice servers to a dedicated Internet link? (Choose three.)
What does the show vlan command display?
What is a correct use-case scenario for ZTP in Enterprise SONiC?