Refer to the exhibit.An engineer receives a pair of the modules shown to install in a pair of MXL switches.Which cables does the engineer need for this module?
An engineer needs to assign two PCIe NICs and a GPU to a server node in a VRTX chassis.Which two steps are required to complete this task? (Choose two.)
A VRTX server is being set up for a new customer and configured with four blades. After a shutdown from a power outage, blades do NOT power up automatically upon power restore. Blades can be powered up either manually or via CMC.Which setting should be verified to make sure blades automatically power up upon power restore?
An engineer is installing a known good PCIe storage adapter in SLOT 1 of an FX2 chassis with four half height nodes. Node 1 is NOT detecting the adapter.What must the engineer do so that node 1 can detect the adapter?
An engineer is installing 10Gb modules into a pair of MXL switches.Which cable is correct for this installation?A.B.C.D.
An engineer needs to limit the power consumption of a chassis without powering down any server nodes.Which step should the engineer take to perform this task?