Question 31 🔥

An engineer is redeploying a blade chassis, and is logged into the CMC web interface. The engineer has configured the iDRACs for the blade servers.When the engineer tries to log into one of the iDRACs, the connection fails. The engineer can ping the CMC from the engineers workstation but can NOT ping the iDRACs. The engineer tries to ping the iDRAC IP from the CMC itself using the diagnostic tool, but that also fails.Which two tasks should the engineer perform? (Choose two.)

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 32 🔥

An engineer needs to connect two MXL switches that both have SFP+ add-on module.Which cable will complete this task?A.B.C.D.

Question 33 🔥

Refer to the exhibit.An engineer receives a pair of the modules shown to install into a pair of MXL switches.Which cables does the engineer need for this module?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 34 🔥

An engineer is adding an additional server to a chassis with 15 existing servers. The new server will NOT power on in any slot, even known good.Existing server configuration -- Dual processor- 256GB Memory- PERC RAID Controller- 2x 1TB 7200RPM SATA HDD- QLogic Dual Port 10GbE Network Daughter Card (Fabric A)- QLogic 16Gb Fibre Channel Mezz Card (Fabric B)New server configuration -- Dual processor- 192GB Memory- No RAID- Internal SD Card- Intel Quad Port 1GbE Network Daughter Card (Fabric A)- QLogic Dual Port 10GbE CNA Mezz Card (Fabric B)The details of the chassis are as follows:- Four 2700W Power Supplies- Redundancy Policy is configured for Power Supply Redundancy- Plugged into 220V ACPower Monitoring logs show the original servers max draw as 418W each.Which problem needs to be addressed to fix this issue?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 35 🔥

An engineer is troubleshooting a VRTX with the following configuration:- Dual Shared PERC Internal cards in a fault tolerant configuration- Nodes installed in SLOTS 1 and 2- Virtual adapters set to Multiple Assignment- Two virtual drives set to Full Access on SLOTS 1 and 2The OS of the node in SLOT 1 shows more than the two disks assigned to it.What should the engineer do to fix this issue?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question
Question 36 🔥

A VRTX has storage set up as a RAID 10 in a 16-drive disk group. Each drive is 1.6 TB for a total of 12.8 TB space in the disk group. There are currently 14 virtual disks of 600GB each. The engineer needs to create three more virtual disks. The engineer successfully creates two virtual disks but is unable to create the third because there are NO physical disks to choose from.What must the engineer do to create the final virtual disk?

Which database solution meets these requirements?
Highly voted
Highly voted
Highly voted
Highly voted
Discussion of the question