Why would you use an eligibility criteria in usage subscription?
You need to set up a configuration that allows service points to be used with various meters. This configuration should support interval, time of use, and scalar devices.How would you meet this requirement?
Which TWO functions can the service point-measurement cycle relationship of Meter Data Management (MDM) perform? (Choose two.)
A small building with five metered apartments has common areas used by all residents. The common areas are metered separately, and the common usage needs to be spread evenly across residents.How should you configure the solution to bill each resident accurately?
A customer needs to validate high or low tolerances such that exceeding in either direction must not allow the reading to be finalized. In addition, all other validation rules that are configured must be applied to the readings.Which exception severity should you configure in Validation, Estimation, and Editing (VEE) rules?
Initial measurement data (IMD) is imported into Meter Data Management (MDM) and can be viewed through the Measuring Component portal, but is not in the "Final" measurement status.What has the IMD passed in this case?