Which TWO Validation, Estimation, and Editing (VEE) rules are typically configured on a project for consumption synchronization processes? (Choose two.)
The client has installed scalar devices to measure the solar energy generated (export) and the energy received (import) from the market. This data is stored in separate measuring components (registers). The validation rules are generally the same for both measuring components, but there is one exception: the negative consumption check applies only to energy received (import).Which TWO configurations ensure that the negative consumption rule is checked for energy received (import) only? (Choose two.)
Usage transactions can contain date breaks. What is used to supply date breaks?
Which THREE are best practices for measurement retention? (Choose three.)
50. Your client requests you to design and set up data necessary to support an electric meter that is installed at a customer's service point with solar panels:Channel 1: Measures the kWh that was consumed from the grid. This is an interval channel that measures in 60-minute intervals.Channel 2: Measures the kWh that was generated. This is an interval channel that measures in 60-minute intervals.Using the Math usage rule, you must create usage transactions that take the difference between the consumed and generated channels, store and name the difference value, and store the derived curve.Which THREE statements are true? (Choose three.)